concepts of small lot production 2

Solve Problem #2 (parts a, b, c) and Problem #4 (parts a, b, c), in page 132. Use Excel

View and study PowerPoint Presentation: TECH3180-Lean-Module-3-SmallLot-EOQ-SetupTime.pdf TECH3180-Lean-Module-3-SmallLot-EOQ-SetupTime.pdf – Alternative Formats

Study the solved problems on EOQ, EMQ in Chapter 5.

Internet resources:

Small Lot Production
http://www.strategosinc.com/lean_lot_sizing.htm

Setup time reduction:
http://www.reliableplant.com/Read/8667/setup-time-reduction